Code Inspection Type Description
B= Building Final When building is ready for occupancy and all other final inspections have been approved.
B=R Building Roofing Final
BBB Building Bond Beam
BE Building Extension
BFD Building Foundation Drain If a peripheral drain is required by the soils engineer, the drain must be inspected.  Call for inspection prior to backfilling the foundation and when pipe, rock, filter paper and sand is installed (follow the design in the engineer's report).
BFI Building Foundation Insulation This applies to buildings that need to install rigid insulation on the exterior of the foundation wall or slab.
BFN Building Foundation When continuous footings are not used, or at the direction of the inspector who made the footing inspection, call for inspection when the forms are in place, level, braced and when reinforcing steel is in place and secured.  Required void material must be installed (follow the design in the engineers report).
BFR Building Frame After preceding inspections have been approved, roof, windows, doors, all blocking, bracing, exterior wall sheathing, stairs, chimneys and fireplaces are in place.  BEFORE INSULATION IS INSTALLED.
BFT Building Footing When regular continuous footings are used, call for inspection when footings are excavated, neat, clean, dry and forms are in place, level, braced and reinforcing bar if required is in place and tied.  Reinforcing bar must be suspended in place a minimum of 3 inches above the soil.  If footings are on fill, you must have a compaction report by an engineer on job site at time of inspection.
BIN Building Insulation This applies to all heated buildings.  It includes all the insulation that can be concealed such as cavity insulation walls, floors and vaulted ceilings and any continuous insulation builders may use such as rigid prior to exterior sheathing.
BLA Building Lath When ready for the application of stucco (ideally this would be ready at time of frame inspection).
BM Building Masonry
BSP Building Special Inspection
BT= Building Temporary Final
BTD Building Temporary Tie Downs Building Temporary Tie Downs for Mobile-Home/Manufactured Buildings.
BTR Building Tiled Roof Inspection After all underlayment and batten strips are in place.  Before any tile is installed.
BUL Underlayment
E= Electric Final
EE Electric Extension
EP Electrical Panel
ER Electric Rough
ER+ Electric Rough (Additional)
ER= Electric Rough & Final
ERS Electric Rough & Service
ES Electric Service
ES+ Electric Service (Additional)
ES= Electric Service & Final
ESL Electric Slab
EST Electric Service Temporary
ET Mobile Home Electrical
EUG Electric Ungerground
H= Heat Final When all applianced are gas piped, wired, vented and the thermostat is in place (your gas meter will be ordered by the inspector when heating final is approved).
HC Heat Construction Meter Commercial Only.  This is a special inspection which may enable the gas meter to be set prior to final inspection.
HD Heat Duct Commercial Only.  This inspection shall be made on all occupancies except R-3 (Single Family, Duplexes, Townhouses), after the duct work is in place and before it is concealed.
HE Heat Extension
HI Heat Gas Inside When all gas piping is in place, secured and has had ten pounds of air pressure for fifteen (15) minutes (Low Pressure Systems) prior to inspection (applies to all gas piping on the house side of the gas meter above ground).
HI+ Heat Gas Outlet Addition Gas Line inspection when additional gas outlets are installed after initial HI inspection is completed.
HLP Heat LP Gas Drain This inspection shall be made after the piping is in place and run to daylight, prior to being covered.
HO Heat Outside When all gas piping is in place, secured and has had ten pounds of air pressure fifteen (15) minutes (Low Pressure Systems) prior to inspection (applies to all gas piping on the house side of the gas meter below ground).
HO= Heat Mfg Outside & Final
HRP Heat Refrigeration Piping This inspection shall be made after all piping and tubing that conveys refrigeration gas has been installed and before it is concealed.
HRR Heat Residential Rough This inspection is for R-3 occupancies and encompasses all the rough mechanical work within a dwelling.  This inspection includes, but is not limited to, all gas appliance vents as well as all supply, return and exhaust duct systems.  This inspection is to be accomplished after all work has been completed and the roof is in place so that the structure is dried in and before any work is concealed.
HRR+ Heat Residential Rough Additional
HT Mobile Home Mechanical
HV Heat Vent Commercial Only.  This inspection shall be made after the vents are installed and the roof is in place so that the structure is dried in and before the vents are concealed.
HWP Heat Process Steam & Water Piping This inspection shall be made after the steam and water piping systems that are part of a heating or cooling system have been installed and before it is covered and concealed.
HWP+ Heat Process Steam & Water Piping Additional
H=E Elevator Final
H02 Elevator 6 Month Inspection
H03 Elevator Follow-up Inspection
H05 Elevator Equipment Red Tag
P= Plumbing Final When all plumbing work is completed and fixtures are in place.
P=S Plumbing Lawn Sprinkler
PB Plumbing Base When the base is in place and under test, before backfilling and before the floor is poured (if slab on grade or basement type structure. Note: outside water line must be inspected before the trench is backfilled).
PB+ Plumbing Base Additional When the base is in place and under test, before backfilling and before the floor is poured (if slab on grade or basement type structure. Note: outside water line must be inspected before the trench is backfilled).  Additional inspection.
PBP Plumbing  Backflow Preventer
PBS Plumbing Building Sewer Building Sewer Inspection performed by Colorado Springs Utilities.
PE Plumbing Extension
PGI Plumbing Grease Interceptor
PO= Plumbing Mfg Residential Set & Final Manufactured residential structure's outside water and final inspection.
PRD Plumbing Roof Drain When the roof drainage system piping is in place, but not yet concealed.
PT Plumbing Mobile-Home/Manufactured Housing Plumbing Mobile-Home/Manufactured Building inspection
PTO Plumbing Top-Out / Water in When all fixture drain lines, vents and water supply lines are in place and under test.
PTO+ Plumbing Top-Out / Water in Additional When all fixture drain lines, vents and water supply lines are in place and under test.  Additional inspection.
PWO Plumbing Water Out When the water-service ditch has been excavated and the service line placed in the ditch, but not yet backfilled.
W= Wrecking Final