UNKNOWN | B= | C | 04/21/1995 | OK FOR CO (Original code: 04, desc: Struc. Final, result: Pass, inspector: DL) | | | | B= | C | 125775 | UNKNOWN | B= | C | 04/17/1995 | NEED PERM ADDRESS #'S/NEED CONTINOUS HANDRAIL FROM TOP STEP TO LANDING/ADJUST DOOR CLOSURE/OK FOR TEMP C.O. (Original code: 04, desc: Struc. Final, result: Pass, inspector: ) | | | | B= | C | 125857 | UNKNOWN | BSH | C | 02/21/1995 | (Original code: 24, desc: Sheathing, result: Pass, inspector: DL) | | | | BSH | C | 126906 | UNKNOWN | BFR | C | 02/06/1995 | (Original code: 03, desc: Struc. Frame, result: Pass, inspector: ) | | | | BFR | C | 127141 | UNKNOWN | BFR | C | 02/02/1995 | TRUSS LETTER; TRUSS BLOCKING; CK ON WINDOWS (Original code: 03, desc: Struc. Frame, result: Pass, inspector: ) | | | | BFR | C | 127200 | UNKNOWN | BFN | C | 11/29/1994 | (Original code: 02, desc: Struc. Foundation, result: Pass, inspector: DL) | | | | BFN | C | 128435 | UNKNOWN | BFN | R | 11/28/1994 | CAN'T SEE COVERED UP - NAILED (Original code: 02, desc: Struc. Foundation, result: Fail, inspector: DL) | | | | BFN | R | 128454 | UNKNOWN | BFT | C | 11/18/1994 | LATER-BETTER (Original code: 01, desc: Footing, result: Pass, inspector: DL) | | | | BFT | C | 128567 | CONTRACTOR NOT SPECIFIED | E= | C | 04/13/1995 | (Original code: 08, desc: Elec. Final, result: Pass, inspector: DL) | | | | E= | C | 125914 | CONTRACTOR NOT SPECIFIED | ES | C | 03/31/1995 | (Original code: 06, desc: Elec. Permanent, result: Pass, inspector: DL) | | | | ES | C | 126140 | CONTRACTOR NOT SPECIFIED | ER | C | 01/31/1995 | (Original code: 07, desc: Elec. Rough, result: Pass, inspector: DL) | | | | ER | C | 127252 | CONTRACTOR NOT SPECIFIED | EST | C | 11/30/1994 | (Original code: 05, desc: Elec. Temporary, result: Pass, inspector: DL) | | | | EST | C | 128381 | CONTRACTOR NOT SPECIFIED | H= | C | 04/12/1995 | W/C NEED COMB. AIR FOR WATER HEATER-CHECK COMB AIR & REGISTERS ON BLDG FINAL (Original code: 14, desc: Heat Final, result: Pass, inspector: DL) | | | | H= | C | 125955 | CONTRACTOR NOT SPECIFIED | HFV | C | 02/06/1995 | (Original code: 25, desc: ???, result: Pass, inspector: ) | | | | HFV | C | 127140 | CONTRACTOR NOT SPECIFIED | HI | C | 01/31/1995 | (Original code: 12, desc: Gas Line Bldg, result: Pass, inspector: ) | | | | HI | C | 127253 | CONTRACTOR NOT SPECIFIED | HV | C | 01/30/1995 | (Original code: 16, desc: Vents/Ducts, result: Pass, inspector: DL) | | | | HV | C | 127273 | CONTRACTOR NOT SPECIFIED | HI | R | 01/27/1995 | gauge read 7#s but not press in piping (Original code: 12, desc: Gas Line Bldg, result: Fail, inspector: DL) | | | | HI | R | 127289 | CONTRACTOR NOT SPECIFIED | HI | R | 01/20/1995 | ONLY 5# PRESSURE (Original code: 12, desc: Gas Line Bldg, result: Fail, inspector: DL) | | | | HI | R | 127427 | CONTRACTOR NOT SPECIFIED | HO | C | 01/13/1995 | W/C BRING RISE UP TO GRADE (Original code: 13, desc: Gas Line Yard, result: Pass, inspector: DL) | | | | HO | C | 127553 | CONTRACTOR NOT SPECIFIED | P= | C | 04/12/1995 | FINISH GROUTING SHOWERS (Original code: 11, desc: Plumb. Final, result: Pass, inspector: DL) | | | | P= | C | 125941 | CONTRACTOR NOT SPECIFIED | PTO | C | 02/01/1995 | (Original code: 10, desc: Plumb. T/O & Supp, result: Pass, inspector: DL) | | | | PTO | C | 127235 | CONTRACTOR NOT SPECIFIED | PB | C | 12/19/1994 | (Original code: 09, desc: Plumb. Base, result: Pass, inspector: DL) | | | | PB | C | 128001 |
|
|