CONTRACTOR NOT SPECIFIED | BSP | R | 01/18/2008 | RCVD ENG LTR FOR SEPTIC, CMS (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 156783 | CONTRACTOR NOT SPECIFIED | BSP | R | 05/05/2006 | TH ENG LETTER REC.D (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 159606 | LEE INDUSTRIES, LLC | OS= | R | 11/09/2007 | (Original code: 35, desc: Septic Final, result: , inspector: ) | | | | OS= | R | 164750 | LEE INDUSTRIES, LLC | OSPT | R | 11/07/2007 | system failed, Lee Ind. called for inspection, cms,, Larry, 460-6909 (Original code: 34, desc: Septic Partial, result: , inspector: ) | | | | OSPT | R | 164776 | LEE INDUSTRIES, LLC | OS= | C | 05/05/2006 | *Internal Tickler* Changes on Eng Design OK Per KHD, this tickler is to follow up on ENg Letter for changes. AD Permit back in file. Engineer letter rec'd. AD (Original code: 35, desc: Septic Final, result: Pass, inspector: AD) | | | | OS= | C | 40819 | LEE INDUSTRIES, LLC | OS= | R | 05/02/2006 | P.M. TH. Wrong Engineer Design installed. Design dated 1-23-06 superceeds design dated 8-19-05. AD (Original code: 35, desc: Septic Final, result: FAIL, inspector: AD) | | | | OS= | R | 40917 | LEE INDUSTRIES, LLC | OSP | R | 12/09/2005 | House does not have numbers. It is the first drive on right after turning right on to Ponderosa. (Original code: 33, desc: Septic Pre-Site, result: , inspector: ) | | | | OSP | R | 156520 | LEE INDUSTRIES, LLC | OSP | R | 11/29/2005 | property not adequately marked. (Original code: 33, desc: Septic Pre-Site, result: fail, inspector: KHD) | DAHLK | DAHLK | | OSP | R | 44663 |
|
|