BOUSQUET BUILDING SERVICES | B= | C | 11/13/2006 | heat passed need landings at doors ckc (Original code: 04, desc: Struc Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | B= | C | 35176 | BOUSQUET BUILDING SERVICES | BFR | C | 07/17/2006 | (Original code: 03, desc: Struc. Frame, result: pass, inspector: JRH) | HARRISJ | HARRISJ | | BFR | C | 38897 | BOUSQUET BUILDING SERVICES | BUL | C | 06/30/2006 | per al pictures in file (Original code: 43, desc: Ice & Water Shield, result: pass, inspector: JRH) | HARRISJ | HARRISJ | | BUL | C | 39302 | BOUSQUET BUILDING SERVICES | BSH | C | 06/26/2006 | WALLS AND ROOF (Original code: 24, desc: Sheathing, result: Pass, inspector: WR) | RUONAW | RUONAW | | BSH | C | 39484 | BOUSQUET BUILDING SERVICES | BFT | C | 05/30/2006 | momo (Original code: 01, desc: Footing, result: pass, inspector: JRH) | HARRISJ | HARRISJ | | BFT | C | 40235 | BAVARIAN ELECTRIC | E= | C | 09/06/2006 | CKC bond panel, never had electric underground, this will be accepted as non-compliant, electrical contractor claims that trench was open at the time of the electrical rough, which I never recieved the origional inspection request for, he claims that it was open at the service inpection which was never caleed for or never entered, rkd (Original code: 08, desc: Elec. Final, result: pass, inspector: RKD) | DRUMR | DRUMR | | E= | C | 37307 | BAVARIAN ELECTRIC | ER | C | 07/12/2006 | (Original code: 07, desc: Elec. Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 39049 | BAVARIAN ELECTRIC | ER | R | 07/10/2006 | missed inspection TH I never recieved a copy of this 07-10-2006, rkd (Original code: 07, desc: Elec. Rough, result: , inspector: ) | | | | ER | R | 164510 | COLORADO NATURAL GAS | HO | C | 11/08/2006 | CKC- PM (Original code: 13, desc: Gas Line Yard, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | HO | C | 35291 |
|
|