TIMBER GHOST CONSTRUCTION LLC | BIN | C | 01/24/2023 | insulation approved. framing corrections made and approved. | STEINM | STEINM | | BIN | C | 260892 |
TIMBER GHOST CONSTRUCTION LLC | BSP | C | 11/14/2022 | 1ST PRE CO
STILL NEED: HI, HO, BFR, BIN,
ALL FINALS NEEDED: E=,=P=,H=, HFF, D=, DA=, B= SEPTIC - NEED ALL INSPECTIOS, ENG LTR AND AS BUILT
DRIVEWAY ON PERMIT A53346
GC - EM'D 11/21/22 | HOEKMANL | HOEKMANL | | BSP | C | 259266 |
TIMBER GHOST CONSTRUCTION LLC | BFR | C | 11/10/2022 | BFR COMPLETE PER BIN INSPECTION ON 1/24/2023 | STEINM | STEINM | | BFR | C | 259239 |
TIMBER GHOST CONSTRUCTION LLC | BFR | R | 11/07/2022 | need SHT16's at covered porch beams per sheet S3. need (2) H2.5T's per sheet S3 note 7. WINDOW NEXT TO SHOWER IN MASTER BEDROOM NEEDS TO BE TEMPERED BY FINAL. | STEINM | STEINM | | BFR | R | 259121 |
TIMBER GHOST CONSTRUCTION LLC | BSP | C | 08/31/2022 | R-19 Paper Batt insulation in exterior wall behind fire place chase, plenum box going through roof for vent pipe allowing for 1" clearance, all cracks are sealed with FR foam, 5/8 type X drywall will be going over the top of the insulation. | GARNETT | GARNETT | | BSP | C | 257035 |
TIMBER GHOST CONSTRUCTION LLC | BGF | C | 06/27/2022 | | STEINM | STEINM | | BGF | C | 255340 |
TIMBER GHOST CONSTRUCTION LLC | BUL | C | 06/27/2022 | approved. whole roof snow and ice | STEINM | STEINM | | BUL | C | 255339 |
TIMBER GHOST CONSTRUCTION LLC | BSH | C | 03/25/2022 | Roof and wall sheathing approved | TROEGERR | TROEGERR | | BSH | C | 252860 |
TIMBER GHOST CONSTRUCTION LLC | BPR | C | 01/24/2022 | Six front and three rear deck/porch piers | TROEGERR | TROEGERR | | BPR | C | 251688 |
TIMBER GHOST CONSTRUCTION LLC | BSP | C | 10/08/2021 | OK to backfill. dlw | WILSOND | WILSOND | | BSP | C | 248821 |
TIMBER GHOST CONSTRUCTION LLC | BSP | R | 10/06/2021 | Need four wire from garage to new structure.need disconnect on outside of house. dlw | WILSOND | WILSOND | | BSP | R | 248765 |
TIMBER GHOST CONSTRUCTION LLC | BFN | C | 08/06/2021 | approved for foundation wall and interior pads | STEINM | STEINM | | BFN | C | 247065 |
TIMBER GHOST CONSTRUCTION LLC | BFT | C | 07/02/2021 | Open hole report in images, Uffer in west wall | TROEGERR | TROEGERR | | BFT | C | 246121 |
TIMBER GHOST CONSTRUCTION LLC | BSP | C | 06/15/2021 | RCVD OPEN HOLE | CORCORANC | CORCORANC | | BSP | C | 245589 |
TIMBER GHOST CONSTRUCTION LLC | BE | P | 05/12/2021 | Renewed for No Fee at 5/12/2021 11:50:40 AM | CAMPBELLRK | CAMPBELLRK | | BE | P | 244736 |
HOMEOWNER | ER | C | 10/26/2022 | UF wire needs to be in Conduit in and out of ground, Need outlet at grade front and back or side and opposite side, dlw | WILSOND | WILSOND | | ER | C | 258812 |
AMPED UP ELECTRIC LLC | EUG | C | 08/26/2019 | | WILSOND | WILSOND | | EUG | C | 229659 |
HOMEOWNER | HO | C | 03/20/2023 | gas line approved | STEVENSONR | STEVENSONR | | HO | C | 262006 |
HOMEOWNER | HI | C | 01/24/2023 | | STEINM | STEINM | | HI | C | 260891 |
HOMEOWNER | HRR | C | 11/07/2022 | | STEINM | STEINM | | HRR | C | 259125 |
HOMEOWNER | HRR | R | 10/25/2022 | dryer vent needs to be hard piped. | STEINM | STEINM | | HRR | R | 258740 |
HOMEOWNER | HFV | C | 10/25/2022 | approved for wood stove | STEINM | STEINM | | HFV | C | 258739 |
HOMEOWNER | PTO | C | 10/25/2022 | | STEINM | STEINM | | PTO | C | 258738 |