HENSEL PHELPS CONSTRUCTION CO. | B= | P | 11/13/2020 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet, MECHONE, INC. Mechanical Final Inspection is not Completed yet. Test and Balance report on site, CSFD inspected and passed Plumbing final completed | TROEGERR | TROEGERR | | B= | P | 241124 |
HENSEL PHELPS CONSTRUCTION CO. | BFR | P | 10/23/2020 | approved for frame rm. 212 south wall, | STEINM | STEINM | | BFR | P | 240610 |
HENSEL PHELPS CONSTRUCTION CO. | BSP | P | 10/22/2020 | Walls In Decon Room and Sterile Room. dlw | WILSOND | WILSOND | | BSP | P | 240558 |
HENSEL PHELPS CONSTRUCTION CO. | BSP | C | 10/21/2020 | CHANGE ORDER # 2 FOR EQUIPMENT RELOCATION APPROVED | HARTSFIELDK | HARTSFIELDK | | BSP | C | 240497 |
HENSEL PHELPS CONSTRUCTION CO. | BSP | C | 09/30/2020 | Change Order #1 for ASI #1 and Addendum #2 APPROVED | HARTSFIELDK | HARTSFIELDK | | BSP | C | 239891 |
HENSEL PHELPS CONSTRUCTION CO. | B= | P | 09/24/2020 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO. Plumbing Final Inspection is not Completed yet. approved for phase 1. pending inspection results for C.S.F.D med. gas. , State rough and finale. 3rd party med. air test and servicing inc. | STEINM | STEINM | | B= | P | 239675 |
HENSEL PHELPS CONSTRUCTION CO. | BFR | P | 09/15/2020 | approved for new door, room 109 | STEINM | STEINM | | BFR | P | 239326 |
ENCORE ELECTRIC INC | E= | C | 11/06/2020 | Ionazation Equipment Room, Decon Room and Sterile Room, dlw | WILSOND | WILSOND | | E= | C | 240945 |
ENCORE ELECTRIC INC | ER | P | 10/30/2020 | Ceilings,Decon Room, and Sterile Room. dlw | WILSOND | WILSOND | | ER | P | 240740 |
ENCORE ELECTRIC INC | E= | P | 09/22/2020 | Final Phase #1. dlw | WILSOND | WILSOND | | E= | P | 239585 |
ENCORE ELECTRIC INC | ER | C | 09/16/2020 | Pahse #1 OK. dlw | WILSOND | WILSOND | | ER | C | 239403 |
MECHONE, INC. | H= | C | 11/20/2020 | | TROEGERR | TROEGERR | | H= | C | 241296 |
MECHONE, INC. | H= | P | 10/30/2020 | rooms 212 and 213 approved, pending test and balance report. | STEINM | STEINM | | H= | P | 240733 |
MECHONE, INC. | H= | P | 10/23/2020 | 16" damper for sterilizing room 213 approved. need to see retaining angle at final. recieved revision for eliminating fire rated wall for Decon 211- north wall. | STEINM | STEINM | | H= | P | 240607 |
MECHONE, INC. | HD | P | 10/14/2020 | room 211. approved for new 6" and 8" duct and framing for damper. noted and dated on field set. | STEINM | STEINM | | HD | P | 240286 |
MECHONE, INC. | HRR | C | 10/12/2020 | hvac rough and final for rm 222 approved | STEINM | STEINM | | HRR | C | 240194 |
MECHONE, INC. | H= | P | 09/24/2020 | approved for phase 1 | STEINM | STEINM | | H= | P | 239661 |
MECHONE, INC. | HRR | P | 09/14/2020 | rough mechanical damper from room 108 to 109 | STEINM | STEINM | | HRR | P | 239281 |
OLSON PLUMBING & HEATING CO. | P= | C | 11/13/2020 | Corrections completed, fire caulking at peneterations, drains at backflow preventers | TROEGERR | TROEGERR | | P= | C | 241123 |
OLSON PLUMBING & HEATING CO. | P= | P | 11/12/2020 | R/O system, sanitizing system supply lines, floor drain connections Hand wash sinks and sanitizer unit connections Backflow preventer drains need to be intalled Fire caulking at wall penetrations, Support outlet hose from DI unit | TROEGERR | TROEGERR | | P= | P | 241081 |
OLSON PLUMBING & HEATING CO. | PTO | P | 10/22/2020 | sterilizing rm. 212 approved for south south wall and over head. rm. 213 approved for north west corner wall and overhead. RO/DI east wall approved. RO/DI over head not ready. add partial frame for rm 212 south wall, approved pending rough electric. | STEINM | STEINM | | PTO | P | 240575 |
OLSON PLUMBING & HEATING CO. | PB | P | 10/15/2020 | approved for room 213 sterilization room for plumbing base, underground. | STEINM | STEINM | | PB | P | 240354 |