B K CONSTRUCTION CO. | B= | C | 02/14/2022 | ALL FILES AND INSPECTIONS COMPLETE | HOEKMANL | HOEKMANL | | B= | C | 252108 |
B K CONSTRUCTION CO. | B= | C | 02/11/2022 | | TROEGERR | TROEGERR | | B= | C | 252122 |
B K CONSTRUCTION CO. | B= | P | 02/11/2022 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet. | TROEGERR | TROEGERR | | B= | P | 252093 |
B K CONSTRUCTION CO. | B= | P | 02/11/2022 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet. | TROEGERR | TROEGERR | | B= | P | 252091 |
B K CONSTRUCTION CO. | B= | C | 02/11/2022 | | TROEGERR | TROEGERR | | B= | C | 252121 |
B K CONSTRUCTION CO. | BIN | C | 02/11/2022 | Certs on site | TROEGERR | TROEGERR | | BIN | C | 252088 |
RAWSON ROOFING LLC | BUL | C | 11/01/2021 | | STEINM | STEINM | | BUL | C | 249508 |
B K CONSTRUCTION CO. | BSP | C | 10/28/2021 | 1st Pre CO- need BUL, GC contacted | CORCORANC | CORCORANC | | BSP | C | 249402 |
B K CONSTRUCTION CO. | BIN | P | 10/18/2021 | Batt insulation completed, Blown-in insulation to checked at final | TROEGERR | TROEGERR | | BIN | P | 249117 |
B K CONSTRUCTION CO. | BGF | C | 10/18/2021 | | TROEGERR | TROEGERR | | BGF | C | 249116 |
B K CONSTRUCTION CO. | BFR | C | 10/07/2021 | approved | STEINM | STEINM | | BFR | C | 248786 |
B K CONSTRUCTION CO. | BSP | C | 10/06/2021 | ENG RCVD FOR BEAM POCKET | CORCORANC | CORCORANC | | BSP | C | 248722 |
B K CONSTRUCTION CO. | BFR | R | 10/01/2021 | missing anchor bolts. missing beam pocket for interior 2 ply lvl beam. can re inspect at next inspection | STEINM | STEINM | | BFR | R | 248631 |
B K CONSTRUCTION CO. | BSH | C | 09/14/2021 | approved for walls and roof | STEINM | STEINM | | BSH | C | 248075 |
RD TOTH CONSTRUCTION, LLC DBA COLORADO MOUNTAIN BUILDERS, LL | BPR | C | 07/07/2021 | approved per plan | STEINM | STEINM | | BPR | C | 246195 |
RD TOTH CONSTRUCTION, LLC DBA COLORADO MOUNTAIN BUILDERS, LL | BFD | C | 06/17/2021 | EZz Flow system, one daylight | TROEGERR | TROEGERR | | BFD | C | 245723 |
RUSIN, LTD. | BFN | C | 06/03/2021 | | TROEGERR | TROEGERR | | BFN | C | 245265 |
RUSIN, LTD. | BFT | C | 06/01/2021 | Property set backs checked, Port-a-potty on site Uffer in east garage footing Need Open Hole report scanned into permit | TROEGERR | TROEGERR | | BFT | C | 245211 |
RD TOTH CONSTRUCTION, LLC DBA COLORADO MOUNTAIN BUILDERS, LL | BSP | C | 06/01/2021 | RCVD OPEN HOLE | CORCORANC | CORCORANC | | BSP | C | 245200 |
FOX EXCAVATION | D= | C | 02/11/2022 | Driveway is almost flat. Passed. | DINNOCENZOM | DINNOCENZOM | | D= | C | 252056 |
FOX EXCAVATION | DA= | C | 02/11/2022 | Direct access to County road. Passed. | DINNOCENZOM | DINNOCENZOM | | DA= | C | 252055 |
MILLS CONSTRUCTION | DP | C | 04/08/2021 | Direct access to County road. Permit issued. | DINNOCENZOM | DINNOCENZOM | | DP | C | 244041 |
AMPED UP ELECTRIC LLC | E= | C | 01/31/2022 | Missing counter tops. dlw | WILSOND | WILSOND | | E= | C | 251821 |
AMPED UP ELECTRIC LLC | EP | C | 01/31/2022 | Missing counter tops, dlw | WILSOND | WILSOND | | EP | C | 251820 |
AMPED UP ELECTRIC LLC | EUG | C | 10/28/2021 | | HEDGESS | HEDGESS | | EUG | C | 249409 |
AMPED UP ELECTRIC LLC | EUG | P | 10/01/2021 | At this inspection there was a trench to the septic and the hot tub. Still need power to house, dlw | WILSOND | WILSOND | | EUG | P | 248600 |
AMPED UP ELECTRIC LLC | ER | C | 10/01/2021 | | WILSOND | WILSOND | | ER | C | 248598 |
AMPED UP ELECTRIC LLC | ES | C | 05/28/2021 | Residential Overhead: Perm Service. dlw | WILSOND | WILSOND | | ES | C | 245185 |
B K CONSTRUCTION CO. | FP= | C | 02/14/2022 | | HOEKMANL | HOEKMANL | BDA | FP= | C | 252106 |
WESTERN FIREPLACE SUPPLY | HFV | C | 02/14/2022 | | CAMPBELLRK | CAMPBELLRK | | HFV | C | 252107 |
HARRIS HEATING, LLC | H= | C | 02/11/2022 | Approved | TROEGERR | TROEGERR | | H= | C | 252089 |
WESTERN FIREPLACE SUPPLY | HFF | C | 01/06/2022 | Clearances met | TROEGERR | TROEGERR | | HFF | C | 251362 |
GLASER ENERGY GROUP, INC | HO | C | 12/16/2021 | test pressure approved | TROEGERR | TROEGERR | | HO | C | 250922 |
HARRIS HEATING, LLC | HRR | C | 10/01/2021 | | STEINM | STEINM | | HRR | C | 248630 |
PEAK PLUMBING & HEATING, INC. | HI | C | 10/01/2021 | | STEINM | STEINM | | HI | C | 248629 |
WESTERN FIREPLACE SUPPLY | HV | P | 09/27/2021 | approved from bottom chord truss to roof sheathing | STEINM | STEINM | | HV | P | 248437 |
FOX EXCAVATION | OS= | C | 12/08/2021 | Engineer letter and As-Built drawing in images | TROEGERR | TROEGERR | | OS= | C | 250623 |
FOX EXCAVATION | OSPT | C | 10/14/2021 | Partial, need float tree set, need As-Built drawing and engineer letter | TROEGERR | TROEGERR | | OSPT | C | 249005 |
PEAK PLUMBING & HEATING, INC. | P= | C | 02/11/2022 | Approved | TROEGERR | TROEGERR | | P= | C | 252090 |
PEAK PLUMBING & HEATING, INC. | PTO | C | 10/01/2021 | | STEINM | STEINM | | PTO | C | 248628 |
PEAK PLUMBING & HEATING, INC. | PB | C | 08/02/2021 | Test pressure approved | TROEGERR | TROEGERR | | PB | C | 246933 |